[1]CHU Xuening. Product manufacturability comprehensive evaluation on fussy set theory[J]. Computer Integrated Manufacturing Systems, 1998, 4(2): 27-31(in Chinese).[褚学宁. 基于模糊集理论的产品可制造性综合评价[J]. 计算机集成制造系统,1998,4(2):27-31.] [2]ONG S K, SUN M J, NEE A Y C. A fuzzy set AHP-based DFM tool for rotational parts[J]. Journal of Materials Processing Technology, 2003, 138(1-3): 223-230.
[3]AMALNIK M S, MCGEOUGH J A. Intelligent concurrent manufacturability evaluation of design for electrochemical maching[J]. Journal of Material Processing Technology, 1996, 61(1-2): 130-139.
[4]MINIS L, HERRMANN J W, LAM G, et al. A generative approach for concurrent manufacturability evaluation and subcontractor selection [J]. Journal of Manufacturing Systems, 1999, 18(6): 383-395.
[5]SONG Yuyin, XIAO Yihui, CHENG Ye, et al. Research on product manufacturability and its evaluation method[J]. Journal of Tsinghua University (Sci & Tech), 1998, 38(7):111-114(in Chinese).[宋玉银,肖亦晖,成晔,等. 产品可制造性及评价方法的研究[J]. 清华大学学报(自然科学版), 1998, 38(7):111-114.]
[6]CHU X N, HOLM H. Product manufacturing control for concurrent engineering[J]. Computer in Industry, 1994, 24(6):29-38.
|