[1] NAKAGAWA T. Optimal policy of continuous and discrete replacement with minimal repair at failure [J]. Naval Research Logistics Quarterly, 1984, 31(4): 543-550. [2]CANFIELD R V. Cost optimization of periodic preventive maintenance [J].IEEE Transactions on Reliability, 1986, 35(1): 78-81.
[3]SHEU S, GRIFFITH W S, NAKAGAWA T. Extended optimal replacement model with random minimal repair costs [J]. European Journal of Operational Research, 1995, 85(3): 636-649.
[4]BARLOW R E, HUNTER L C. Optimum preventive maintenance policies [J]. Operations Research, 1960, 8(1): 90-100.
[5]PHAM H, WANG H Z. Imperfect maintenance [J]. European Journal of Operational Research, 1996, 94(3): 425-438.
[6]MALIK M A K. Reliable preventive maintenance policy [J]. AIIE Transactions, 1979, 11(3): 221-228.
[7]NAKAGAWA T. Sequential imperfect preventive maintenance policies [J]. IEEE Transactions on Reliability, 1988, 37(3): 295-298.
[8]JAYABALAN V, CHAUDHURI D. Cost optimization of maintenance scheduling for a system with assured reliability [J]. IEEE Transactions on Reliability, 1992, 41(1): 21-25.
[9]CHAN J K, SHAW L. Modeling repairable systems with failure rates that depend on age and maintenance [J]. IEEE Transactions on Reliability, 1993, 42(4): 566-571.
[10]HAN Bangjun, FAN Xiumin, MA Dengzhe, et al. Optimization of equipment preventive maintenance cycle in production system based on genetic algorithm [J]. Computer Integrated Manufacturing Systems, 2003, 9(3): 206-209(in Chinese).[ 韩帮军,范秀敏,马登哲,等. 用遗传算法优化制造设备的预防性维修周期模型[J].计算机集成制造系统,2003, 9(3): 206-209. ]
|