[1]AXS A S. A framework for decentralized multi-echelon inventory control\[D\]. London,U.K.: London University,1995. [2]LEE H, MOINZADEH K. Operating characteristics of a two-echelon inventory system for repairable and consumable items under batch ordering and shipment policy\[J\]. Naval Research Logistics, 1987, 34: 365-380.
[3]WANG Wei,CHAI Yueting,REN Shouju.Just-in-time purchase method for agile supply Chain\[J\].Journal of Tsinghua University(Sci.& Tech.),2000,40(3):83-85(in Chinese).\[王玮, 柴跃廷,任守榘. 敏捷供需链中的准时采购计划方法研究\[J\]. 清华大学学报, 2000,40(3):83-85\].
[4]ANDERSSON J, AXS A S. Decentralized multi-echelon inventory control\[J\]. Production and Operations Management,1998,7: 370-386.
[5]SVERINE H M.Re-engineering the UK private house building supply chain\[D\].Wales,U.K.:University of Wales Cardiff,2002.
[6]TOWILL D R. Fundamental theory of bullwhip induced by exponential smoothing algorithm\[R\]. Wales,U.K.: Cardiff University, 1999.
[7]DEJONCKHEERE J. Measuring the bullwhip effect: a control theoretic approach to analyse forecasting induced bullwhip in order-up-to plicies\[R\]. Belgium:Cardiff University, Wales and Leuven University, 2001.
[8]STALK G. Competing against time:how time-based competition is reshaping global markets\[M\]. New York,NY,USA: The Free Press,1990.
[9]GRAHAM D. The synthesis of optimum transient response: criteria and standard forms\[J\]. Transactions of the American Institute of Electrical Engineers,Applications and Industry,1953, 72:273-288.
|