[1]
STALK G Jr. Time-the next source of competitive advantage [J]. Harvard Busines
s Review, 1988, 66(4):41-51.
[2] HUM S H, SIM H H. Time-based competition:literature review and impli
cat
ion for molding [J]. International Journal of Operations & Production Manageme
nt, 1996, 16(1):75-90.
[3] SPEKMAN R, SALMOND D, KAMAUFF J. At last procurem
ent becomes st
rategic [J]. Long-Range Planning,1994,27(2):76-84.
[4] MA Shihua. The requisition of national high-tech. R&D program for CIMS [R]
. Wuhan: Huazhong University of Science & Technology, 2001
(in
Chinese). [马士华.国家高技术
(863计划)课题申请书[R].武汉:华中科
技大学,2001.]
[5] Ritong Compositive Institute,WU Runtao, et al. Handbo
ok
of logistics [M].Beijing:China Material Press, 1986(in Chinese).[日通综合
研究所, 吴润涛,等. 物流手册[M].北京: 中国物资出版社, 1986.]
[6] QIN Mingsen, WANG Fangzhi. Applied logistics technology [M]. Beijing:China
Material Press, 1991(in Chinese).[秦明森, 王方智. 实用物流技术[M]. 北京:
中国物资出版社,1991.]
[7] KUEHN A A,HAMBURGER M J. A heuristic program for location wareho
uses [J]. Management Science, 1963, 9(6): 643-666.
[8] CAI Xixian, XIA Shizhi. Quantitative methods for rationalization of lo
gisti
cs [M]. Wuhan: Huazhong University of Science & Technology Press,1985(in Ch
inese).[蔡希贤, 夏士智. 物流合理化的数量方法[M].武汉:华中理工大学出
版社,1985.][JP]
[9] ARCELO J,CASANOVAS J. A heuristic lagrangian algorithm for th
e capacit
ated plant location problem [J].European Journal of Operational Research, 198
4, 15(2): 212-226.
[10] LI Yanhui,MA Shihua,LIU Liming. Model and heuristic algorithm for dist
ribution
system based on time constraints [J]. System Engineering, 2003,21(4): 23-28
(in Chinese).[李延晖, 马士华, 刘黎明. 基于时间约束的配送系统模型及一种启发式
算法
[J].系统工程,2003,21(4):23-28.]
|