[1] LUO Zhiqing, WANG Runxiao,LEI Jian,et al. A study on the assistant mechanical time quota[J]. Machine tool & Hydraulics, 2004,(12):62-64(in Chinese) .[罗志清, 王润孝,雷 建,等. 机械制造辅助加工时间标准的研究[J]. 机床与液压. 2004,(12):62-64.] [2] BAO Fengda, WONG Xinzhen. The software solving of multiple regression and correlation analysis and case explanation[J]. Application of Statistics and Management,2000, 20(5):56-60(in Chinese). [包凤达, 翁心真. 多元回归分析的软件求解和案例解读[J]. 数理统计与管理, 2000, 20(5):56-60.]
[3] ZHU Jun. Principles of linear model analysis[M]. Beijing: Science Press,1999(in Chinese). [朱 军. 线性模型分析原理[M].北京: 科学出版社, 1999.]
[4] KIM G H, AN S H, KNG K I. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning[J]. Building and Environment,2004,39(10) :1235-1242.
[5] CHATTERJE,HADI A S,PRICE B. Regression analysis by example(3rd Edition)[M].Wiley Series in Probability and Statistics,2003.43-52.
|