[1] LASSERRE J B. An integrated model for job-shop planning and scheduling[J]. Management Science, 1992, 38(8): 1201-1211. [2] XIONG Rui, CHEN Haoxun, HU Baosheng. An integration model for production planning and job shop scheduling and its lagrangian relaxation-based solution approach [J]. Journal of Xidian University, 1996, 23(4): 510-516(in Chinese).[熊 锐,陈浩勋,胡保生. 一种生产计划与车间调度的集成模型及其拉氏松弛求解法[J]. 西安电子科技大学学报,1996,23(4):510-516.]
[3] ANWAR M F, NAGI R. Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-up[J]. International Journal of Production Research, 1997, 35(5): 1447-1470.
[4] XIONG Hongyun, HE Yue. An integrated model jointing lot-sizing and scheduling for flexible flow-line and its genetic heuristic algorithm[J]. Journal of Changsha Railway University, 2001,19(1):51-55(in Chinese).[熊红云, 何 钺. 面向柔性生产线的分批与调度集成模型及其遗传启发算法[J]. 长沙铁道学院学报, 2001, 19(1): 51-55.]
[5] TANG Lixin. Theory and application of lot-Sizing problem in CIMS[M]. Beijing: Science Press,1999.134-137 (in Chinese).[唐立新. CIMS下生产批量计划理论及其应用[M]. 北京: 科学出版社, 1999. 134-137.]
[6] WANG Xiaoping, CAO Liming. Genetic algorithm-theory, application and software develop [M]. Xi’an:Xi’an Jiaotong University Press, 2002. 46-47 (in Chinese).[王小平, 曹立明. 遗传算法-理论、应用与软件实现[M].西安:西安交通大学出版社,2002. 46-47.]
[7] BRAH S A, LOO L L. Heuristics for scheduling in a flowshop with multiple processors[J]. European Journal of Operational Research, 1999, 113(1): 113-122.
|