[1] TAN W,KHOSHNEVIS B. Integrated process planning and scheduling a mathematical programming modeling approach[D].Los Angeles,CA,USA:University of Southern California,1997. [2] BRANDINARTE P, CALDERINI M. A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling[J]. International Journal of Production Research,1995,33(1):161-181.
[3] WU Dezhong, YAN Junqi, WANG Liya. Research of concurrent and distributed integration of CAPP and PPC[J]. Journal of Shanghai Jiaotong University,1996,30(12):1-6(in Chinese).[吴德中,严隽琪,王丽亚. CAPP与PPC的并行分布式集成研究[J]. 上海交通大学学报,1996,30(12):1-6.]
[4] ZHAO Tianqi, DENG Jianchun, TONG Guofan, et al. The research on part dynamic process model based on the scheduling and controlling for FMS[J]. Chinese Mechanical Engineering,1998,9(9):36-38(in Chinese). [赵天奇,邓建春,童国凡,等. 面向FMS生产调度和控制的零件动态工艺模型研究[J]. 中国机械工程, 1998,9(9):36-38.]
[5] WANG Shuting. Research of virtual simulation orienting production line[D].Wuhan:Huazhong University of Science and Technology,2002(in Chinese).[王书亭. 面向生产线的虚拟仿真研究[D].武汉:华中科技大学,2002.]
[6] ZHAO Ning, LIANG Fujun, NING Ruxin. Rapid batch changing oriented reconfigure technology of manufacturing line [J]. Chinese Journal of Mechanical Engineering, 2004,40(11):103-106 (in Chinese).[赵 宁,梁福军,宁汝新.面向快速变批量生产的生产线重构技术[J]. 机械工程学报,2004, 40(11):103-106.]
[7] EGBELU P J, TANCHOCO M A. Characterization of automated guided vehicle dispatching rules[J]. International Journal of Production Research, 1984,22(3):359-374.
|