[1]HOMEN-DE-MELLO T, SHAPIRO A, SPEARMAN M L. Finding optimal material release times using simulation-based optimization[J]. Management Science, 1999, 45(1): 86-102.
[2]DUENYAS I, HOPP W J, SPEARMAN M L. Characterizing the output process of a CONWIP line with deterministic processing and random outage[J]. Management Science, 1993, 39(8): 975-988.
[3]汪定伟.MRP-Ⅱ与JIT结合的生产管理方法[M].北京:科学出版社, 1996.
[4]SPEARMAN M L, ZAZANIS M A. Push and pull production systems: issues and comparisons[J]. Operations Research, 1992, 40(3): 521-532.
[5]GROSFELD NIR A, MAGAZINE M, VANBERKEL A. Push and pull strategies for controlling multistage production systems[J]. International of Journal of Production Research, 2000, 38(11): 2361-2375.
[6]GOVIL M K, FU M C. Queueing theory in manufacturing: A survey[J]. Journal of Manufacturing Systems, 1999, 18(3): 214-240.
[7]顾启泰.离散事件系统建模与仿真[M].北京:清华大学出版社,1999.
[8]HALL R W. Queueing methods: for service and manufacturing[M]. Englewood Cliffs: Prentice Hall, 1991.
|