[1] ZHOU Xionghui, LI Xiang, RUAN Xueyu. Study on task plan algorithm for injection product and mold collaborative design[J].Chinese Journal of Mechanical Engineering, 2003,39(2):113-117(in Chinese).[周雄辉,李 祥,阮雪榆.注塑产品与模具协同设计任务规划算法研究[J].机械工程学报, 2003, 39(2): 113-117.] [2] DONG Ming, CHENG Fuan, ZHA Jianzhong, et al. A matrix scheduling method in concurrent design process[J].Journal of Tianjin University, 1997,30(4):408-415(in Chinese).[董 明,程福安,查建中,等. 并行设计过程的一种矩阵规划方法[J].天津大学学报, 1997, 30(4): 408-415.]
[3] PARK H, CUTKOSKY M R. Framework for modeling dependencies in collaborative engineering processes[J].Research in Engineering Design, 1999,11(2):84-102.
[4] WANG K L, JIN Y. Modeling dependencies in engineering design[A].Proceedings of the ASME Design Theory and Methodology Conference[C].Las Vegas,NV,USA:ASME Press.1999.
[5] TANG D, ZHENG L, LI Z, et al. Re-engineering of the design process for concurrent engineering[J].Computers & Industrial Engineering, 2000, 38(4): 479-491.
[6] ZHAO Jinmin, LIU Jihong, ZHONG Yifang, et al. A new tearing method of coupled task set within concurrent design process[J].Computer Integrated Manufacturing Systems, 2001, 7(4): 36-39,72(in Chinese).[赵晋敏, 刘继红, 钟毅芳,等. 并行设计中耦合任务割裂规划的新方法[J].计算机集成制造系统, 2001, 7(4): 36-39,72.]
[7] SU J C, CHEN S, LIN L. A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design[J].Computers & Industrial Engineering, 2003,45(1):195-214.
[8] YANG Bo, HUANG Kezheng, SUN Hongwei. Assignment and planning of task supporting concurrent engineering[J].Computer Integrated Manufacturing Systems, 2002, 8(7): 542-545,560(in Chinese).[杨 波, 黄克正,孙红卫. 面向并行工程的任务分配与规划[J].计算机集成制造系统, 2002, 8(7): 542-545,560.]
[9] CHEN S, LIN L. Decomposition of interdependent task group for concurrent engineering[J].Computers & Industrial Engineering, 2003, 44(3):435-459.
|