[1] GUNASEKARAN A, WALTER W C C. Special issue on supply chain management for the 21st century organizational competitiveness[J].International Journal of Production Economics, 2004, 87(3): 209-212. [2] LIN Huiping, FAN Yushun, WU Cheng. Research of integrated planning and scheduling based on hierarchy scheduling model[J].Computer Integrated Manufacturing Systems, 2002, 8(8): 602-606 (in Chinese).[林慧苹,范玉顺,吴 澄. 基于分层调度模型的生产计划和调度集成研究[J].计算机集成制造系统, 2002, 8(8): 602-606.]
[3] CHRISTOPH S, KIRSTIN Z. Hierarchical coordination mechanisms within the supply chain[J].European Journal of Operational Research, 2004, 153(3): 687-703.
[4] ZHOU Jinhong, WANG Dingwei. Production planning for supply chain for multi-location plants and distributors[J].Information and Control, 2001, 30(2): 169-172 (in Chinese).[周金宏,汪定伟. 分布式多工厂、多分销商的供应链生产计划模型[J].信息与控制, 2001, 30(2): 169-172.]
[5] GNONI M G, IAVAGNILIO R, OSSA G, et al. Production planning of a multi-site manufacturing system by hybrid modelling: a case study from the automotive industry[J].International Journal of Production Economics, 2003, 85(2): 251-262.
[6] ZAEVEDO A L, SOUSA J P. A component-based approach to support order planning in a distributed manufacturing enterprise[J].Journal of Materials Processing Technology, 2000, 107(1):431-438.
[7] SAUER J, APPELRATH H J. Scheduling the supply chain by teams of agents[A].Procecdings of the 36th Annual Hawaii International Conference on System Sciences[C].Washington D.C.,USA:IEEE Computer Souety, 2003.81.
[8] SUN Yongjun. Study on theory and method of agile supply chain synergic production management[D].Hangzhou: Zhejiang University, 2003 (in Chinese).[孙永军. 敏捷供应链协同生产管理理论与方法研究[D].杭州: 浙江大学, 2003.]
[9] MARK S F, MIHAI B, RUNE T. Agent-oriented supply-chain management[J].International Journal of Flexible Manufacturing Systems, 2000, 12(2): 165-188.
[10] NORMAN M S, DAVID W H, DAG K, et al. MASCOT: an agent-based architecture for coordinated mixed-initiative supply chain planning and scheduling[A].Proceedings of the 3rd International Conference on Autonomous Agents[C].Seattle, Washington,USA:ACM Press, 1999.1-16.
[11] KOLISCH R. Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies[J].International Journal of Production Economics, 2000, 64(1): 127-141.
[12] DAVID H, ASTGHIK B, ANDREW K. Scheduling manufacturing systems in an agile environment[J].Robotics and Computer-Integrated Manufacturing, 2001, 17(1): 87-97.
|