[1] DAVIS L.Job shop scheduling with genetic algorithms[A].Proceedings of the First International Conference on Genetic Algorithms[C].Hillsdale:Lawrence Erlbaum Associates,1985.136-140. [2] SRIDHAR J,RAJENDRAN C S.Scheduling in flow shop and cellular manufacturing with multiple objectives-a genetic algorithm approach[J].Production Planning and Control,1996,7(4): 374-382.
[3] ISHIBUCHI H,MURATA T.A multi-objective genetic local search algorithm and its application to flow shop scheduling[J].IEEE Transactions on Systems,Man and Cybernetics(Part C),1998,28(3): 392-403.
[4] PONNAMBALAM S G,RAMKUMAR V,JAWAHAR N.A multi-objective genetic algorithm for job shop scheduling[J].Production Planning and Control,2001,12(8):764-774.
[5] SAKAWA M,KUBOTA R.Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithm[J].European Journal of Operational Research,2000,12(2): 393-407.
[6] ESQUIVEL S,FERRERO S,GALLARD R,et al.Enhanced evolutionary algorithm for single and multiobjective optimization in job shop scheduling problem[J].Knowledge-Based System,2002,15(1):13-25.
[7] SAKAWA M,MORI T.An efficient genetic algorithm for job shop scheduling problems with fuzzy processing time and fuzzy due date[J].Computers and Industrial Engineering,1999,36(2):325-341.
[8] GENG Zhaoqiang,ZOU Yiren.Study on job shop fuzzy scheduling based on genetic algorithm[J].Computer Integrated Manufacturing Systems,2002,8(8):616-620(in Chinese).[耿兆强,邹益仁.基于遗传算法的作业车间模糊调度的研究[J].计算机集成制造系统,2002,8(8):616-620.]
[9] KNOWLES J D,CORNE D W.Approximating the non-dominated front using the Pareto archive evolutionary strategy[J].Evolutionary Computation,2000,8(2):149-172.
[10] ZITZLER E,LAUMANNS M,THIELE L.SPEA2:improving the strength Pareto evolutionary algorithm[R].Lausanne,Switzerland:Swiss Federal Institute of Technology,2001.
[11] ZITZLER E,THIELE L.Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach[J].IEEE Transaction on Evolutionary Computation,1999,3(4):257-271.
[12] DBE K,PRATAP A,AGARWAL S,et al.A fast and elitist multiobjective genetic algorithms: NSGA-Ⅱ[J].IEEE Transactions on Evolutionary Computation,2002,6(2):182-197.
[13] FIELDSEND J E,EVERSON R M,SINGH S,et al.Using unconstrained elicit archives for multiobjective optimization[J].IEEE Transactions on Evolutionary Computation,2003,7(3):302-323.
[14] WANG Ling.Shop scheduling with genetic algorithm[M].Beijing:Tsinghua University Press,2003(in Chinese).[王 凌.车间调度及其遗传算法[M].北京:清华大学出版社,2003.]
[15] ISHII H,TADA M,MASUDA T.Two scheduling problem with fuzzy due dates[J].Fuzzy Sets and Systems,1992,46(2):339-347.
|