[1] CHEN Qiang, HUANG Sheng. Study and application of production center shipbuilding method[J].China Shipbuilding,2003,44(30):5-17(in Chinese).[陈 强,黄 胜.生产中心制造船模式的研究与应用[J].中国造船,2003,44(30):5-17.] [2] SUN Linyan. Human factors engineering[M].Beijing: China Agricultural Science and Technology Press,2003(in Chinese).[孙林岩.人因工程[M].北京:中国科学技术出版社,2003.]
[3] CHO K K.An automatic process-planning system for block assembly in shipbuilding[J]. Annals of the CIRP,1996,45(1):41-44.
[4] DAI Tong. Basic tutorial of CAD/CAPP/CAM[M]. Beijing:China Machine Press,1997(in Chinese).[戴 同.CAD/CAPP/CAM基本教程[M].北京:机械工业出版社,1997.]
[5] YUAN Chongfu, CHEN Bingsen. Mode of generating process for assembly and welding process CAPP system of welding structure[J]. Machine of Electric Welding,2001,31(10):27-29(in Chinese).[袁崇福,陈丙森.焊接结构装焊工艺CAPP系统中工艺生成模式[J].电焊机,2001,31(10):27-29.]
[6] WANG Yingluo. Industrial engineering manual[M].Shenyang:Northeastern University Press,2000(in Chinese).[汪应洛.工业工程手册[M].沈阳:东北大学出版社,2000.]
[7] LIU Bin, JIANG Zuhua. An ameliorative Parks algorithm of distance for cluster analysis[J]. Journal of East China Shipbuilding Institute,2004,18(4):51-57(in Chinese).[刘 滨,蒋祖华.改进的Parks聚类分析距离算法[J].华东船舶工业学院学报,2004,18(4):51-57.]
|