[1] ZHU Baolin,YU Haibin. Production scheduling model and algorithm for steelmaking-continuous casting-hot rolling processes[J].Computer Integrated Manufacturing Systems, 2003, 9(1):33-36(in Chinese).[朱宝琳,于海斌. 炼钢-连铸-热轧生产调度模型及算法研究[J].计算机集成制造系统,2003,9(1):33-36.] [2] LOPEZ L, CARTER M W, GENDREAU M. The hot strip mill production scheduling problem: a tabu search approach[J]. European Journal of Operational Research, 1998, 106(2/3): 317-335.
[3] LI Sujian, CHEN Zonghai. Optimal model on slab discharge planning form slab-yard in Baosteel[J]. Logistics Technology, 1996,(1),18-21(in Chinese).[李苏剑,陈宗海. 宝钢板坯库出库计划优化模型[J]. 企业物流,1996,(1): 18-21.]
[4] TANG Lixin, YANG Zihou. Integer programming model and modified genetic algorithm for optimal turned-out slab pile for hot rolling schedule[J]. Acta Automatica Sinica,2000, 26(4): 461-469(in Chinese).[唐立新,杨自厚. 热轧实施计划中最优倒垛问题的整数规划模型及遗传算法[J]. 自动化学报,2000, 26(4):461-469.]
[5] JAMES K, RUSSELL E. Particle swarm optimization[A].IEEE International Conference on Neural Networks[C].USA:IEEE Press,1995.1942-1948.
[6] LI Aiguo,QIN Zheng, BAO fumin, et al. Particle swarm optimization algorithms[J]. Computer Engineering and Application, 2002,37(21):1-4(in Chinese).[李爱国, 覃 征, 鲍复民,等. 粒子群优化算法[J]. 计算机工程与应用,2002,37(21):1-4.]
[7] HUANG Lan, WANG Kangping, ZHOU Chunguang, et al. Particle swarm optimization for traveling salesman problems[J]. Journal of Jilin University(Science Edition), 2003, 41(3): 477-480(in Chinese).[黄 岚,王康平,周春光,等. 粒子群优化算法求解旅行商问题.吉林大学学报(理学版),2003,41(3):477-480.]
|