[1] FRENCH S. Sequencing and scheduling: an introduction to the mathematics of job shop[M].West Sussex,England:Ellis Horwood Ltd.,1982. [2] GAREY M R, JOHNSON D S, SETHI R. The complexity of flowshop and job shop scheduling[J]. Mathematics of Operations Research,1976,1(2):117-129.
[3] AZZARO P C, BERNAL H L, BAUDET P, et al. A two-stage methodology for short-term batch plant scheduling: discrete-event simulation and genetic algorithm[J]. Computers & Chemical Engineering, 1998,22(10):1461-1481.
[4] FANG Jian, XU Yugeng. An event-driven based job shop scheduling simulation system[J]. Journal of System Simulation,1997,9(4):42-50(in Chinese).[方 剑,徐裕庚.基于事件驱动的车间作业排序仿真调度系统[J]. 系统仿真学报, 1997,9(4):42-50.]
[5] YANG Jiaben, WANG Jiang. A general approach of building virtual production scheduling system for continuous industries in CIM environment[J].Computer Integrated Manufacturing Systems,2000, 6(2):55-60(in Chinese).[杨家本,王 江. CIM环境下连续生产过程通用虚拟生产调度系统[J]. 计算机集成制造系统,2000, 6(2):55-60.]
[6] KELTON W D, SADOWSKI R P, SADOWSKI D A. Simulation with ARENA 2nd edition[M].Highstown,NJ,USA:McGraw-Hill, 2002.
[7] CHEN Xu, WU Zhenye. A new generation visual interactive integrated simulation environment Arena[J]. Computer Applications Research, 2000,(1):9-11(in Chinese).[陈 旭, 武振业.新一代可视化交互集成仿真环境Arena[J]. 计算机应用研究, 2000,1(1): 9-11.]
[8] FEO T A, BARD J F. Flight scheduling and maintenance base planning[J]. MMGT Science, 1989,35(12):1415-1432.
[9] PAN Yanchun, FENG Yuncheng. A new heuristic algorithm for job-shop scheduling[A]. Proceedings of the 7th International Conference on Industrial Management[C].Beijing:China Aviation Industry,Japan,2004.191-196.
|