[1] FANG Weiguo, ZHOU Hong. Organizational structure design under environment of uncertainty[J].Journal of Management Sciences in China, 2000,3(2):9-14 (in Chinese).[方卫国,周 泓. 不确定性环境中组织结构设计[J]. 管理科学学报,2000,3(2):9-14.] [2] GU Yuanxun, FAN Yushun. Cells span calculation in dynamic manufacturing alliance[J]. Systems Engineering, 2003,21(2):23-27(in Chinese).[顾元勋,范玉顺. 动态制造联盟的跨度计算研究[J]. 系统工程,2003,21(2):23-27.]
[3] DONG Hongzhao, CHEN Ying, ZHAO Yanwei. Time-sequence constraint of project disassembly in the networked cooperative manufacturing system[J]. Chinese Journal of Mechanical Engineering, 2004,40(6):28-33(in Chinese).[董红召,陈 鹰,赵燕伟. 企业网络协同制造中目标分解的时序约束[J]. 机械工程学报,2004,40(6):28-33.]
[4] GU Xinjian, SUN Jing, QI Guoning, et al. Granulation analysis and modeling methods for enterprise reference models[J]. Computer Integrated Manufacturing Systems, 2003,9(2):132-136(in Chinese).[顾新建,孙 静,祁国宁,等. 企业参考模型的粒度分析和建立方法[J]. 计算机集成制造系统,2003,9(2):132-136.]
[5] CAO Jian, ZHANG Shensheng, WANG Yinglin. Research on constraint model supporting cooperative product development[J]. Computer Integrated Manufacturing Systems, 2001,7(4):17-21(in Chinese).[曹 健,张申生,王英林. 支持协同产品开发的约束模型研究[J]. 计算机集成制造系统,2001,7(4):17-21.]
[6] KWORK Y K, AHAMD I. Dynamic critical-path scheduling: an effective technique for allocating task graphs to multiprocessors[J]. IEEE Transactions on Parallel and Distributed Systems, 1996,7(5):506-521.
[7] AHMAD I,KWORK Y K. On exploit task duplication in parallel program scheduling[J]. IEEE Transaction on Parallel and Distributed Systems, 1998,9(9): 872-892.
[8] RAMJI B, Sivaramakrishnan K, Shyam S. A resource granularity framework for estimating opportunity costs[J]. Accounting Horizons, 2004, 18(3):197-206.
[9] ARTZ K W,BRUSH T H. Asset specificity, uncertainty and relational norms: an examination of coordination costs in collaborative strategic alliances[J]. Journal of Economic Behavior & Organization, 2000,41(4):337-362.
|