[1] HOMEM de MELLO L S,SANDERSON A C. Evaluation and selection of assembly plans[A].Proceedings of the IEEE 1990 International Conference on Robotics and Automation[C].Los Alamitos,CA,USA:IEEE Computer Society Press,1990.1588-1593. [2] HOMEM de MELLO L S. Two criteria for the selection of assembly plans: maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks[J]. IEEE Transaction on Robotics and Automation, 1993,17(5):626-633.
[3] CEGKAREK D J. Multivariate analysis and evaluation of adaptive sheet metal assembly system[J]. Annals of the CIRP,1998,47(1):7-22.
[4] ZHENG Taixiong. Study on the theory and method of virtual assembly[D]. Chongqing: Chongqing University,2003(in Chinese).[郑太雄.虚拟装配理论与方法研究[D].重庆:重庆大学,2003.]
[5] GU Tingquan, GAO Guoan, XU Xiangyang. Study on the approach for generation and evaluation of assembly sequences for assembly process planning[J]. Computer Integrated Manufacturing Systems,1998,4(1):25-27(in Chinese).[顾廷权,高国安,徐向阳. 装配工艺规划中装配序列生成与评价方法研究[J]. 计算机集成制造系统,1998,4(1):25-27.]
[6] LI Lei, BAI Fangni, WEI Shengmin. On overall evaluation of assembly sequences based on fuzzy theory[J]. Mechanical Science and Technology,2001,(1):134-135(in Chinese).[李 磊,白芳妮,魏生民. 基于模糊理论的装配序列综合评价[J]. 机械科学与技术,2001,(1):134-135.]
[7] LI Lei, WEI Shengmin, ZHANG Junbo. On overall fuzzy evaluation of assembly sequences[J]. China Mechanical Engineering,2003,14(18):1606-1609(in Chinese).[李 磊,魏生民,张军波. 装配序列的模糊综合评价[J].中国机械工程,2003,14(18):1606-1609.]
[8] XIE Chi, ZHONG Zan. Entropy method and its application in comprehensive evaluation of banks performance[J]. China Soft Science, 2002,(9):108-110(in Chinese).[谢 赤,钟 赞. 熵权法在银行经营绩效综合评价中的应用[J]. 中国软科学,2002,(9):108-110.]
|