[1] WILLIAMS G B.The Boeing commercial airplane engineering simulation,new airplane project,management observations[A].Procecedings of the AIAA Modeling and Simulation Technologies Conference[C].New Orleans,LA,USA:American Institute of Aeronautics and Astronautics,1997,341-350. [2] BENEDETTI D A.GALILEO risk management process[A].Procecedings of the AIAA Guidance,Navigation,and Control Conference and Exhibit[C].Montreal,Canada:American Institute of Aeronautics and Astronautics,2001.1-6.
[3] ALEXANDROV M,GELBUKH A,MAKAGONOV P.Evaluation of thematic structure of multidisciplinary documents and document flows[A].2000 Proceedings 11th International Workshop[C].Greenwich,U.K.:IEEE Computer Society Press,2000.125-129.
[4] ZHAO J L.Workflow-centric distribution of organizational knowledge: the case of document flow coordination[A].2002 HICSS.Proceedings of the 35th Annual Hawaii International Conference[C].HI,USA:IEEE Computer Society Press,2002.3796-3803.
[5] LUDWIG H,WHITTINGHAM K.VEC: gateways for cross-organizational document flow[J].Multimedia,IEEE,2000,7(4):62-72.
[6] LI Dongbo,TANG Dunbing,ZHANG Shiqi.The research on regrouping-modeling during mould design process[J].Systems Engineering,1999,17(4):27-32(in Chinese).[李东波,唐敦兵,张世琪.模具设计过程的重组建模研究[J].系统工程,1999,17(4):27-32.]
[7] China Architectonics and Architecture Manage Seminar.China network plan[M].Beijing: Earthquake Press,1993(in Chinese).[中国建筑学会建筑统筹管理研究会.中国网络计划技术大全[M].北京:地震出版社,1993.]
|