[1]陈禹六,李清,张锋.经营过程重构和企业集成[M].北京:清华大学出版社,2001.
[2]TASTSIOPOULOS I P, PANAYIOTOU N. The integration of activity based costing and enterprise modeling for reengineering purposes[J]. International Journal of Production Economics,2000, 66(1): 33-44.
[3]ALDOWWAISAN T A, GAAFAR L K. Business process reengineering: an approach for process mapping[J]. Omega, Int. Jour. Mgmt Sci., 1999, 27(5): 515-524.
[4]CHEN Y, TSENG M M. Stair-like CIM system architecture[J]. IEEE Transactions on Components, Packaging, and Manufacturing Technology(part C: manufacturing), 1997, 20(2): 101-110.
[5]CHEN Yuliu. Stair-like CIM System architecture[J].Computer Integrated Manufacturing Systems, 1999,5(3):30-38(in Chinese).[陈禹六.阶梯形CIM体系结构 [J].计算机集成制造系统—CIMS,1999,5(3):30-38.]
[6]CHEN Y, TSENG M M,YIEN Y. Economic view of CIM system architecture[J]. Production Planing and Control,1998, 9(3): 241-249.
[7]张锋,陈禹六.基于活动的成本计算法(ABC)在BPR中的应用 [J].清华大学学报(自然科学版),2000, 40(9): 104-108.
[8]BABU G J A, SURESH N. Project management with time, cost, and quality considerations[J]. European Journal of Operations Research,1996, 88(2): 320-327.
[9]KHANG D B, MYINT Y M. Time, cost and quality trade-off in project management: a case study[J]. International Journal of Project Management,1999, 17(4): 249-256.
|