[1]TANG Lixin, et al. Analysis of modeling factor of integrated lot planning for SM-CC-HRM [J]. Iron and Steel, 2000,(5):74-76(in Chinese).[唐立新,等.炼钢-连铸-热轧集成批量计划因素分析[J].钢铁,2000,(5):74-76.]
[2]SUN Fuquan, ZHENG Binglin, TANG Lixin, et al. Steelmaking, continuous casting and hot charge rolling integrated scheduling management [J]. Iron and Steel,1998,(12):71-75(in Chinese).[孙福权,郑秉霖,唐立新,等.炼钢-连铸-热轧一体化集成调度管理[J].钢铁,1998,(12):71-75.]
[3]WANG Zhaohui, CHEN Haoxun, HU Baosheng. Scheduling for batch chemical processes using Lagrangian Relaxation-based approach[J]. Acta Automation Sinica, 1998,(1):1-7(in Chinese).[王朝晖,陈浩勋,胡保生.用Lagrangian 松弛法解化工批处理调度问题[J].自动化学报,1998,(1):1-7.]
[4]TANG Lixin, YANG Zihou, WANG Mengguang. Research on steelmaking and continuous casting production scheduling[J]. Acta Automation Sinica, 1998,(1):9-14(in Chinese).[唐立新,杨自厚,王梦光.基于准时制的炼钢-连铸生产调度问题的研究[J].自动化学报,1998,(1):9-14.]
[5]TANG Lixin, LIU Jiyin, YANG Zihou. A mathematical programming model for scheduling steelmaking- continuous casting production [J]. European Journal of Operational Research, 2000,(120): 423-435.
[6]TANG Lixin, LIU Jiyin, RONG Aiying, et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baogang Iron & Steel Complex [J]. European Journal of Operational Research, 2000,(124): 267-282.
[7]HOITOMP D J, LUH P B. A practical approach to job-shop scheduling problems[J]. IEEE Trans. Robotics and Automation,1993, 9 (1):1-13.
[8]LUH P B,et al. An effective approach for job-shop scheduling with uncertain processing requirements [J]. IEEE Trans.Robotics and Automation,1999,15 (2):329-339.
|