• 论文 •    

卧式加工中心现场失效数据分析实例研究

朱海平,邓超,刘繁茂,邓宇浩   

  1. 1.华中科技大学 数字制造装备与技术国家重点实验室,湖北武汉430074;2.湖南科技大学 机械设备健康维护省重点实验室,湖南湘潭411201
  • 出版日期:2010-10-15 发布日期:2010-10-25

Case study on analysis of horizontal machining center field failure data

ZHU Hai-ping, DENG Chao, LIU Fan-mao, DENG Yu-hao   

  1. 1.State Key Lab of Digital Manufacturing Equipment & Technology, Huazhong University of Science & Technology, Wuhan 430074, China;2.Hunan Provincial Key Lab of Mechanical Equipment Health Maintenance, Hunan University of Science & Technology, Xiangtan 411201, China
  • Online:2010-10-15 Published:2010-10-25

摘要: 基于某大型汽车发动机厂14台卧式加工中心10个月的现场失效采集数据,首先采用卡普兰-梅尔和威布尔变换等方法,得到数据集的威布尔概率纸图;然后根据威布尔概率纸图的曲线形状,采用二重混合威布尔模型作为拟合方程;为了避免直接求解多维非线性似然方程组,将原问题转化为有约束非线性最优化问题,并采用BFGS算法和内点法求解,得到了置信度为95%的模型参数的置信区间;模型的拟合优度检验采用K-S检验方法,结论为在5%的显著性水平下接受这样的寿命分布拟合模型。得到了卧式加工中心失效率函数,为一浴盆曲线,且失效率一直下降,因此设备处于早期故障阶段。计算了卧式加工中心的平均故障间隔时间值。

关键词: 卧式加工中心, 现场失效数据, 混合威布尔模型, 约束非线性优化, 平均故障间隔时间

Abstract: Based on the field failure data of 14 HMCs collected from a large automobile engine plant over ten months, the nonparametric estimation values of reliability level of HMCs were calculated by means of Kaplan-Meier method and Weibull transformation, and the Weibull Plotting Paper (WPP) plots were obtained. According to the curve shape of these WPP plots, the two-fold Weibull mixture model was applied to fit the field data set. To avoid solving the multi-dimensional non-linear likelihood equations directly, the original problem was transformed to a constrained nonlinear optimization problem which was solved by the interior point method and the BFGS formula. The confidence interval of parameter was obtained under the confidence level of 95%. The test of goodness of fit for this model was carried out by K-S test model. Result showed that such a life distribution fitting model was accepted under a significance level of 5%. Finally, the failure rate function of Horizontal Machining Center (HMC) was obtained. It was a bathtub curve with a decreasing failure rate, which meant that the HMC was running at the early stage of failure. The Mean Time Between Failures (MTBF) value of HMC was calculated to be 367 hours approximately.

Key words: horizontal machining center, field failure data, mixture Weibull model, constrained nonlinear optimization, mean time between failures

中图分类号: