[1]MOON S, HRYMAK N. Scheduling of the batch annealing process- deterministic case[J]. Computers and Chemical Engineering,1999, 23(9): 1193-1208.
[2]DONG Jiefang, LIU Zhixin, XIE Jinxing, XING Wenxun. Mathematical model and algorithm for scheduling of steel coils annealing[J].Iron and Steel,2001,36(12): 73-76(in Chinese).[董杰方,刘志新,谢金星,邢文训.钢卷热处理调度的数学模型与算法研究[J].钢铁,2001, 36(12): 73-76.]
[3]AZZARO-PANTEL C, BERNAL-HARO L, BAUDET P,et al. A two-stage methodology for short-term batch plant scheduling:discrete-event simulation and genetic algorithm[J]. Computers and Chemical Engineering,
1998,22(10):1461-1481.
[4]HENNING G P, CERDA J. Knowledge-based predictive and reactive scheduling in industrial environments[J]. Compurers and Chemical Engineering,2000,24(9):2315-2338.
[5]JOHTELA T, SMED J, JOHNSSOR M, et al. Supporting production planning by production process simulation[J]. Computer Integrated Manufacturing Systems, 1997, 10(3):193-203.
[6]FONTANLILI F, VINCENT A, PONSONNET R. Flow simulation and genetic algorithm as optimization tools[J]. Int. Jour. Production Economics, 2000, 64(1-3): 91-100.
|