[1]IMTI ,Inc.Integrated manufacturing technology roadmapping[EB/OL]. webpage:http://www.IMTI21.org. ,2000.
[2]LI Bohu. Integrated manufacturing system technology for complex product[J]. Aeronautical Manufacturing Technology, 2002, (12):17-20(in Chinese).[李伯虎.复杂产品集成制造系统技术[J].航空制造技术, 2002,(12):17-20.]
[3]FROST R. Simulation based acquisition an ongoing look[A]. 98F-SIW-229.doc[C].http://www.siw.org.
[4]LI Bohu, CHAI Xudong. Virtual prototyping engineering for complex product[J]. Computer Integrated Manufacturing Systems—CIMS,
2002,8(9):678-683(in Chinese).[李伯虎,柴旭东.复杂产品虚拟样机工程[J].计算机集成制造系统—CIMS,2002,8(9):678-683.]
[5]OMG Architecture Board MDA Drafting Team. Model-driven architecture: a technical perspective[EB/OL], ftp://ftp.omg.org/pub/docs/ab/2001-02-01.pdf.
[6]BRAMLEY R,GANNON D,STUCKEY T,et al. Component architectures for distributed scientific problem solving[J].IEEE Computational Science and Engineering,1998,5(2):50-63.
[7]KILBY M. Overview of the DOD high level architecture[EB/OL]. http://www.dmso.mil,2000.
[8]LI Bohu, XIONG Guangleng, ZHU Wenhai, ZHANG Heming, QUAN Chunlai. Research and practice on concurrent engineering and virtual manufacture technology[A].Proceedings of 2000 AMSMA,19th [C]. Guangzhou:Guangdong People’s Publishing House,2000.30-39.
[9]LI Bohu, CHAI Xudong, XIONG Guangleng, ZHU Wenhai,ZHANG Heming, QUAN Chunlai. Research and application on virtual prototyping engineering for complex product[A]. The Proceedings of the Summer Computer Simulation Conference[C]. San Diego, USA:2002.
[10]FOSTER I,KESSELMAN C,GLOBUS:a metacomputing infrastructure toolkit[J].International Journal of Supercomputer Applications,1997,11(2):115-128.
|