[1]EPPINGER S D.odel-based approaches to managing concurrent engineering[J].Journal of Engineering Design,1991,2(4):283-290.
[2]CHO S H,PPINGER S D.A simulation-based process model for managing complex design projects[J].IEEE Transactions on Engineering Management,2005,52(3);316-328.
[3]ALTUS S S,KROO I M,GAGE P J.A genetic algorithm for scheduling and decomposition of multidisciplinary design problems[J].Journal of Mechanical Design,1996,118(4):486-489.
[4]HISHAM M A,BAO H.A simulation-based optimization framework for product development cycle time reduction[J].IEEE Transactions on Engineering Management,2006,53(1):69-85.
[5]WHITFIELD R I,DUFFY A H B,COATES G,et al.Efficient process optimization[J].Concurrent Engineering Research and Applications,2003,11(2):83-92.
[6]KRISHNAN V,EPPINGER S D,WHITNERY D E.A model-based framework to overlap product development activities[J].Management Science,1997,43 (4);437-451.
[7]LOCH C H,TERWIESC H C.Communication and uncertainty in concurrent engineering[J].Management Science,1998,44(8);1032-1048.
[8]LIN Jun,CHAI K H,BROMBACHER A,et al.Optimal overlapping and functional interaction in product development[J].European Journal of Operational Research,2009,196(3):1158-1169.
[9]YANG Qing,HUANG Jianmei.Project time calculation and optimization based on DSM activities overlapping[J].Systems Engineering—Theory & Practice,2011,31(3);496-504 (in Chinese).[杨青,黄建美.基于活动重叠的DSM项目时间计算及排序优化[J].系统工程理论与实践,2011,31(3);496-504.]
[10]STEWARD D.The design structure system:a method for managing the design of complex systems[J].IEEE Transactions on Engineering Management,1981,28(3):71-74.
[11]YASSINE A,FALKENBURG D,CHELST K.Engineering design management;an information structure approach[J].International Journal of Production Research,1999,37(13):2957-2975. |