[1]SALVESON M E.The assembly line balancing problem[J].Journal of Industrial Engineering,1955,6(3);18-25.
[2]SCHOLL A.Balancing and sequencing of assembly lines[M].2nd ed.Heidelberg,Germany:Physica-Verlag,1999.
[3]KLEIN R,SCHOLL A.Maximizing the production rate in simple assembly line balancing-a branch and bound procedure[J].European Journal of Operational Research,1996,91(2);367-385.
[4]SCHOLL A,KLEIN R.SALOME;a bidirectional branch and bound procedure for assembly line balancing[J].Informs Journal on Computing,1997,9(4);319-334.
[5]SCHOLL A,BECKER C.State-of-the art exact and heuristic solution procedures for simple assembly line balancing[J].European Journal of Operational Research,2006,168(3);666-693.
[6]BOYSEN N,FLIEDNER M.A versatile algorithm for assembly line balancing[J].European Journal of Operational Research,2008,184(1);39-56.
[7]LI Ming,TANG Qiuhua,XI Zhongmin,et al.One-sided multi-objective assembly line balancing model based on multi-layer programming[J].Systems Engineering—Theory & Practice,2011,31(11);2185-2190(in Chinese).[李明,唐秋华,席忠民,等.基于多层规划的单边多目标装配线平衡调度模型[J].系统工程理论与实践,2011,31(11):2185-2190.]
[8]BAUTISTA J,PEREIRA J.A dynamic programming based heuristic for the assembly line balancing problem[J].European Journal of Operational Research,2009,194(3):787-794.
[9]SCHOOL A,FLIEDNER M,BOYSEN N.ABSALOM;balancing assembly lines with assignment restrictions[J].European Journal of Operational Research,2010,200(3):688-701.
[10]ZHANG Zeqiang,CHENG Wenming,ZHONG Bin,et al.Improved ant colony optimization for assembly line balancing problem[J].Computer Integrated Manufacturing Systems,2007,13(8);1632-1638(in Chinese).[张则强,程文明,钟斌,等.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8);1632-1638.]
[11]YOLMEH A,KIANFAR F.An efficient hybrid genetic algorithm to solve assembly line balancing problem with sequence-dependent setup times[J].Computers & Industrial Engineering,2012,62(3):936-945.
[12]UURDA H F,RACHAMADUGU R,PAPACHRISTOU C A.Designing paced assembly lines with fixed number of stations[J].European Journal of Operational Research,1997,102(3);488-501.
[13]CHIANG W C.The application of a tabu search metaheuristic to the assembly line balancing problem[J].Annals of Operations Research,1998,77(0);209-227.
[14]SCHOLL A,KLEIN R.Balancing assembly lines effectively a computational comparison[J].European Journal of Operational Research,1999,114(1);50-58.
[15]GONCALVES J F,RAIMUDO DE ALMEIDA J.A hybrid genetic algorithm for assembly line balancing[J].Journal of Heuristics,2002,8(6);629-642.
[16]ZHENG Qiaoxian,LI Yuanxiang,LI Ming,et al.Ant colony optimization for type Ⅱ assembly line balancing problem[J].Computer Integrated Manufacturing Systems,2012,18(5);999-1005(in Chinese).[郑巧仙,李元香,李明,等.面向第Ⅱ类装配线平衡问题的蚁群算法[J].计算机集成制造系统,2012,18(5):999-1005.]
[17]LAPIERRE S D,RUIZ A,SORIANO P.Balancing assembly lines with tabu search[J].European Journal of Operational Research,2006,168(3);826-837.
[18]DOU Jianping,SU Chun,LI Jun.Discrete particle swarm optimization algorithms for assembly line balancing problems of type Ⅰ[J].Computer Integrated Manufacturing Systems,2012,18(5);1021-1029(in Chinese).[窦建平,苏春,李俊.求解第Ⅰ类装配线平衡问题的离散离子群优化算法[J].计算机集成制造系统,2012,18(5):1021-1029.] |