[1]ZENG Y J,MA D Z,JIN Y,et al.Hierarchical planning for a surface mounting machine placement[J].Journal of Zhejiang University Science,2004 5(11):1449-1455.
[2]LI S Y,HU C F,TIAN F H.Enhancing optimal feeder assignment of the multi-head surface mounting machine using genetic algorithms[J].Applied Soft Computing,2008,8(1);522-529.
[3]ZHU Guangyu.Memo triangular probability distribution shuffled frog-leaping algorithm[J].Computer International Manufacturing Systems,2009,15(10):1979-1985(in Chinese).[朱光宇.模因内三角概率选择混合蛙跳算法[J].计算机集成制造系统,2009,15(10):1979-1985.]
[4]ZENG Youjiao,YAN Junqi.Feeder assignment problem of placement machine assembling printed circuit board[J].Journal of Shanghai Jiaotong University,2003,37(11):1719-1722(in Chinese).[曾又姣,严隽琪.贴片机贴装印刷电路板中供料器的分配问题[J].上海交通大学学报,2003,37(11):1719-1722.]
[5]KLOMP C,KLUNDERT J,SPIEKSMA F C R,et al.The feeder rack assignment problem in PCB assembly;a case study[J].International Journal of Production Economics,2000,64(1):399-407.
[6]GRUNOW M,GNTHER H O,SCHLEUSENER M,et al.Operations planning for collect-and-place machines in PCB assembly[J].Computer Industrial Engineer,2004,47(4):409-429.
[7]LIU Jian,BI Yajun,TAO Lan.Application improvement Max-Min Ant system optimization SMT placement sequence[C]//Proceedings of 2011 International Conference on Electric Information and Control Engineering.Washington,D.C.,USA:IEEE,2011;4006-4009.
[8]CHEN Y M,LIN C T.A particle swarlm optimization approach to optimize component placement in printed circuit board assembly[J].International Journal of Advanced Manufacture Technology,2007,35(5/6):610-620.
[9]WILLIAM H,PING J.A genetic algorithm to optimize the component placement process in PCB assembly[J].International Journal of Advanced Manufacturing Technology,2005,26(12):1397-1401.
[10]DU Xuan,LI Zongbin,JIA Xiaochen.Component placement process optimization for dual-gantry placement machine based on hybrid genetic algorithm.[J].Journal of Xi’an Jiaotong University,2009,43(5) 80-84(in Chinese).[杜轩,李宗斌,贾晓晨.基于遗传算法的复合式贴片机贴装过程优化[J].西安交通大学学报,2009,43(5):80-84.]
[11]WILLIAM H,PING Ji.Integrated component scheduling models for chip shooter machines[J].Production Economics,2010,123(1):31-41.
[12]CHEN Gonggui,LI Zhihuan,CHEN Jinfu,et al.SFLAlgorithm based dynamic optimalpower flow in wind power integrated system[J].Automation of Electric Power Systems,2009,25(4):25-30(in Chinese).[陈功贵,李智欢,陈金富,等.含风电场电力系统动态优化潮流的混合蛙跳算法[J].电力系统自动化,2009,25(4):25-30.]
[13]PAN Yuxia,PAN Quanke,SANG Hongyan.Hybrid discrete shuffled frog-leaping algorithm for lot-streaming flowshop scheduling problem[J].Computer Integrated Manufacturing Systems,2010,16(6):1265-1671(in Chinese).[潘玉霞,潘全科,桑红燕.批量流水线调度问题的混合离散蛙跳算法[J].计算机集成制造系统,2010,16(6);1265-1671.]
[14]EUSUFF M,LANSEYK E.Optimization of water distribution network design using the shuffled frog leaping algorithm[J].Water Resources Planning and Management,2003,129(3):210-225. |