[1]HARTMANN S,BRISKON D.A survey of variants and extensions of the resource-constrained project scheduling problem[J].European Journal of Operational Research,2010,207(1):1-14.
[2]PENG Wuliang,WANG Chengen.Resource-constrained DTCTP and its algorithm solution[J].Computer Integrated Manufacturing Systems,2008,14(11):2155-2160(in Chinese).[彭武良,王成恩.资源受限的离散时间/成本平衡问题及其遗传算法求解[J].计算机集成制造系统,2008,14(11):2155-2160.]
[3]DE P,DUNNE E J,GHOSH J B,et al.The discrete time/cost trade-off problem revisited[J].European Journal of Operational Research,1995,81(2):225-238.
[4]BRUNI M E,BERALDI P,GUERRIERO F,et al.A heuristic approach for resource constrained project scheduling with uncertain activity durations[J].Computer & Operations Research,2011,38(9);1305-1318.
[5]HERROELEN W,LEUS R.Project scheduling under uncertainty;survey and research potentials[J].European Journal of Operational Research,2005,165(2);289-306.
[6]DEMEULEMEESTER E,HERROELEN W.Introduction to the special issue;project scheduling under uncertainty[J].Journal of Scheduling,2007,10(3);151-152.
[7]ZHANG Jingwen,XU Yu,HE Zhengwen,et al.A review on the time/cost trade-offs problem in project scheduling[J].Journal of Industrial Engineering and Engineering Management,2007,21(1):92-97(in Chinese).[张静文,徐渝,何正文,等.项目调度中的时间—费用权衡问题研究综述[J].管理工程学报,2007,21(1):92-97.]
[8]VANHOUCKE M.The discrete time/cost trade-off problem;extensions and heuristic procedures[J].Journal of Scheduling,2007,10(4):311-326.
[9]PENG Wuliang,WANG Chengen.A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based on solution[J].International Journal of Project Management,2009,27(6):600-609.
[10]ZHANG Jingwen,SHAN Huifang.Two categories of resource-constrained time/ cost trade-off project scheduling problem and its two-stage hybrid optimizing algorithm[J].Computer Integrated Manufacturing Systems,2011,17(9);2035-2043 (in Chinese).[张静文,单绘芳.两类资源约束型工期-费用均衡及两阶段算法[J].计算机集成制造系统,2011,17 (9);2035- 2043.]
[11]HAFIZOGLU A B,AZIZOGLU M.Linear programming based approaches for the discrete time/cost trade-off problem in project networks[J].Journal of the Operational Research Society,2010,61(4):676-685.
[12]SONMEZ R,BETTEMIR O H.A hybrid genetic algorithm for the discrete time-cost trade-off problem[J].Expert System with Applications,2012,39(13):11428-11434.
[13]TAREGHIAN H R,TAHERI S H.A solution procedure for the discrete time,cost and quality tradeoff problem using electromagnetic scatter search[J].Applied Mathematics and Computation,2007,190(2):1136-1145.
[14]KIM J Y,KANG C W,HWANG I K.A practical approach to project scheduling;considering the potential quality loss cost in the time-cost trade-off problem[J].International Journal of Project Management,2012,30(2):264-272.
[15]KLERIDES E,HADJICONSTANTINOU E.A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations[J].Computers and Operations Research,2010,37(12):2131-2140.
[16]KE Hua,MA Weimin,CHEN Xiaowei.Modeling stochastic project time-cost trade-offs with time-dependent activity durations[J].Applied Mathematics and Computation,2012,218(18):9462-9469.
[17]ESHTEHARDIAN E,AFSHAR A,ABBASNIA R.Fuzzy-based MOGA approach to stochastic time-cost trade-off problem[J].Automation in Construction,2009,18(5):692-701.
[18]CHEN S P,TSAI M J.Time-cost trade-off analysis of project networks in fuzzy environments[J].European Journal of Operational Research,2011,212(2):386-397.
[19]DEBLAERE F,DEMEULEMEESTER E,HERROELEN W.Proactive policies for the stochastic resource-constrained project scheduling problem[J].European Journal of Operational Research,2011,214(2):308-316.
[20]AL-FAWZAN M A,HAOUARI M.A bi-objective model for robust resource-constrained project scheduling[J].International Journal of Production Economics,2005,96(2):175-187.
[21]VONDER S V,DEMEULEMEESTER E,HERROELEN W,et al.The use of buffers in project management;the trade-off between stability and makespan[J].International Journal of Production Economics,2005,97(2):227-240.
[22]DEBLAERE F,DEMEULEMEESTER E,HERROELEN W.Reactive scheduling in the multi-mode RCPSP[J].Computer & Operations Research,2011,38(1):63-74.
[23]HAZIR O,HAOUARI M,EREL E.Robust scheduling and robustness measures for the discrete time/cost trade-off problem[J].European Journal of Operational Research,2010,207(2):633-643.
[24]VONDER S V,BALLESTIN F,DEMEULEMEESTER E,et al.Heuristic procedures for reactive project scheduling[J].Computer & Industrial Engineering,2007,52(1):11-28.
[25]CHTOUROU H,HAOUARI M.A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling[J].Computer & Industrial Engineering,2008,55(1);183-194. |