[1]SMITH R G.The contract net protoco1;high-level communication and control in a distributed problem solver[J].IEEE Transactions on Computers,1980,C-19(12);1104-1113.
[2]VAN DYKE PARUNAK H.Manufacturing experience with the contract net[J].Distributed Artificial Intelligence,1987,8(2);285-310.
[3]ZHANG Guohai,JIANG Pingyu,ZHOU Guanghui.Non-cooperation game for multiple design task schedule[J].Journal of Xi’an Jiaotong University,2007,41(3);303-311(in Chinese).[张国海,江平宇,周光辉.多设计任务调度的非合作博弈研究[J].西安交通大学学报,2007,41(3);303-311.]
[4]ZHOU Guanghui,WANG Rui,JIANG Pingyu,et al.Non-cooperation game model and hybrid adaptive genetic algorithm for job-shop scheduling[J].Journal of Xi’an Jiaotong University,2010,44(5);36-39 (in Chinese).[周光辉,王蕊,江平宇,等.作业车间调度的非合作博弈模型与混合自适应遗传算法[J].西安交通大学学报,2010,44(5);36-39.]
[5]MA Huiye,LEUNG H F.Agent-based CDAs and bidding strategies[M].Berlin,Germany:Springer-Verlag,2008;9-28.
[6]ANDREWS M,PRAGER R.Genetic programming for the acquisition of double auction market strategies[M]//Advances in Genetic Programming.Cambridge,Mass.,USA;MIT Press,1994;355-368.
[7]CHEN Shugeng,TAI C C.The Agent-based double auction markets;15 years on[M]//Simulating Interacting Agents and Social Phenomena.Berlin,Germany:Springer-Verlag,2010;119-136.
[8]WANG Shijin.Improved contract net protocol for manufacturing tasks dynamic assignment[J].Computer Integrated Manufacturing Systems,2011,17(6);1257-1263 (in Chinese).[王世进.面向制造任务动态分配的改进合同网机制[J].计算机集成制造系统,2011,17(6);1257-1263.]
[9]VINOD V,SRIDHARAN R.Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system[J].International Journal of Production Economics,2011,129(1);127-146. |