[1]SANTER J A, PARUNAK H V D, BRUECKNER S. Agent-based modeling and control of marine supply chains[J]. Journal of Ship Production, 2001, 17(4): 218-225.
[2]HOLT G D, OLOMOLAIYE P O, HARRIS F C. Evaluating prequalification criteria in contractor selection[J]. Building and Environment, 1994, 29(4): 437-448.
[3]HOLT G D, JENINGS P. Prequalification and multi-criteria selection:a measure contractors opinion[J]. Construction Management and Economics, 1998,16(6):651-660.
[4]NG S T, SKITMORE R M. Client and consultant perspectives of prequalification criteria[J].Building and Environment, 1999, 34(5):607-621.
[5]PALANEESWARAN E, KUMARASWAMY M. Recent advances and proposed improvements in contractor prequalification methodologies[J]. Building and Environment,2001, 36(1):73-87.
[6]BOER L d, LABRO E, MORLACCHI P. A review of methods supporting supplier selection[J].European Journal of Purchasing & Supply Management,2001,7(2):75-89.
[7]YANG Songlin. Method and its application of engineering fuzzy sets[M]. Beijing: National Defence Industry Press,1996(in Chineses).[杨松林.工程模糊论方法及其应用[M].北京:国防工业出版社,1996.]
[8]BARBAROSOGLU G, YAZGAC T. An application of the analytic hierarchy process to the supplier selection problem[J]. Journal of Production and Inventory Management,1997,38(1):14-21.
[9]NYDICK R L, HILL R P. Using the analytic hierarchy process to structure the supplier selection procedure[J]. International Journal of Purchasing and Materials Management,1992,28(2):31-36.
|