[1]LEE D Y, DICESARE F. Scheduling flexible manufacturing systems using Petri net and heuristic search[J].IEEE Transaction on Robotics and Automation, 1994, 10(2):123-132.
[2]HOLSAPPLE W, JACOB V S, PAKATH R and ZAVERI J S. A genetics-based hybrid scheduler for generating static schedules in flexible manufacturing contexts[J]. IEEE Transaction on Systems, Man and Cybernetics,1993, 23(4): 953-972.
[3]JIANG Sijie, XU Xiaofei. Optimal scheduling algorithms for a class of workload balance problems[J]. High Technology Letters, 2000,10(11): 50-52(in chinese). [姜思杰,徐晓飞.一类资源负荷均衡问题的优化调度算法[J]. 高技术通讯,2000,10(11): 50-52.]
[4]JIANG Sijie, XU Xiaofei, LI Quanlong. An optimal genetic based algorithm to solve jobshop scheduling problems[J]. Computer Integrated Manufacturing Systems—CIMS, 2002,8(3): 229-232(in chinese). [姜思杰,徐晓飞,李全龙.基于遗传优化算法求解作业车间调度问题[J].计算机集成制造系统—CIMS, 2002,8(3): 229-232.]
[5]GLOVER F, KELLY J,LAGUNA M. Genetic algorithm and tabu Search: hybrids for optimizations[J]. Computers and Ops.Res, 1995, 22(1): 111-134.
|