[1]HOMEM de M L, LEE S. Computer-aided mechanical assembly planning[R]. Kluwer,1991.
[2]FAZIO de T L,WHITNEY D E. Simplified generation of all mechanical assembly sequence[J].IEEE Journal of Robotics and Automation (RA-3, 116):640-658.
[3]WILSON R H. Minimizing user queries in interactive assembly planning[J]. IEEE Trans. on Robotics and Automation,1995,11(2):308-311.
[4]SUBRAMANI A X, DEWHURST P. Automatic teneration of product disassembly sequence[J]. Annals of the CIRP, 1991, 40(1): 115-118.
[5]ZUSSMAN E, LANZ E, SHPITALNI M. An approach to the automatic assembly planning problem[J]. Annals of the CIRP, 1990, 39(1):33-36.
[6]DINI G, SANTOCHI M. Automatic sequencing and subassembly detection in assembly planning[J]. Annals of the CIRP, 1992, 41(12):3447-3465.
[7]YI Hong, QIU Xiaoli,et al. Study on computer aided assembly process planning system for spindle box of numeric control lathe[J]. Computer Integrated Manufacturing System—CIMS,1997,10(5):40-43(in Chinaese).[易红,仇晓黎,等.数控车床主轴箱计算机辅助装配工艺设计系统的研究[J].计算机集成制造系统—CIMS,1997,10(5):40-43.]
[8]CHEN C L P,PAO Y H. An integration of neural network and rule-based system for design and planning of mechanical assemblies[J]. IEEE Trans.on System, Man and Cybernetics, 1993,23(5):1359-1371.
[9]HONG D S,CHO H S. Generation of robotics assembly sequences using a simulated annealing[A]. Proceedings of the 1999 IEEE/RSJ International Conference on Intelligent Robots and Systems[C]. Kyongju,South Korea:IEEE,1999. 1247-1252.
[10]SEBALLY M, FUJIMOTO H,MRAD F. Linear and non-linear assembly planning fuzzy graph representation and GA search[A]. Proceedings of the 1996 IEEE International Conference on Robotics and Automation[C].Minneapolis, Minnesota,America:IEEE,1996.1533-1638.
[11]LAZZERINI B,MARCELLONI F. A genetic algorithm for generating optimal assembly plans[J]. Artificial Intelligence in Engineering, 2000,14: 319-329.
[12]SMITH S S F, SMITH Greg C,LIAO Xiaoyun. Automatic stable assembly sequence generation and evaluation[J]. Journal of Manufacturing System,2001,20(4):225-235.
|