[1]CHAND S,MCCLURG T,WARD J. A model for paralell machine replacement with capacity expansion[J]. European Journal of Operational Research, 2000,121:519-531.
[2]OLHAGER J, RUDBERG M, WIKNER J. Long-term capacity management: link the perspective from manufacturing strategy and sales and operations planning[J]. International Journal of Production Economics, 2001,69:215-225.
[3]HUA Zhongsheng. Research on line capacity design for a kind of flexible manufacturing system[D]. Hefei:Department of Computer Science and Technology, University of Science and Technology of China, 2000(in Chinese).[华中生.一类柔性制造系统的能力规划问题的研究[D].合肥:中国科学技术大学计算机科学技术系,2000.]
[4]SHAPIRO J F. On the connections among activity-based costing, mathematical programming models for analyzing strategic decisions, and the resource-based view of the firm[J]. European Journal of Operational Research, 1999,118:295-314.
[5]ZHOU Ming, SUN Shudong. Genetic algorithms: theory and application[M]. Beijing:National Defence Industry Press of China, 1999
(in Chinese).[周明,孙树栋.遗传算法原理及应用[M].北京:国防工业出版社,1999.]
[6]LIU Yong, KANG Lishan, CHEN Yuping. Non numerical parallel algorithm—genetic
algorithm[M]. Beijing:Science Press of China,1995(in Chinese).[刘勇,康立山,陈毓屏.非数值并行算法—遗传算法[M].北京
:科学出版社,1995.]
[7]LACKSONEN T.Empirical comparison of search algorithms for discrete event simulation[J]. Computers & Industrial Engineering, 2001,40:133-148.
[8]ZHANG Renqian.Research of production and capacity decision based on activity-based costing[D].Beijing:School of Economics and Management of Beihang University, 2003(in Chinese).[张人千. 基于作业成本的生产与能力决策研究[D].北京:北京航空航天大学经济管理学院,2003.
[9]ZHANG Renqian, WEI Fajie, TAN Zhen. Model and case study of workshop activity optimization based on cost[J].Chinese Journal of Management Science,2002,10(5):74-77(in Chinese).[张人千,魏法杰,谭甄.基于成本的作业优化模型与实证研究[J].中国管理科学,2002,10(5):74-77.]
|