[1]ZHOU B H,CAI J G. The integrated algorithm of part-batching and machine loading in FMS planning[J]. Modular Machine Tool & Automatic Manufacturing Technique, 2001,(11): 1-4(in Chinese).[周炳海, 蔡建国. FMS中的零件分批和机床负荷分配的集成算法[J].组合机床与自动化加工技术, 2001,(11):1-4.]
[2]CRAMA Y, KOLEN A W J, OERLEMANS A G,SPIEKSMA F C R. Minimizing the number of tool switches on a flexible machine[J]. International Journal of Flexible Manufacturing Systems, 1994,6 (1): 33-54.
[3]BARD J F. A heuristic for minimizing the number of tool switches on a flexible machine[J]. IIE Transactions, 1988,20(4):382-391.
[4]TANG C S,et al. Models arising from a flexible manufacturing machine. Part I: Minimization of the number of tool switches[J].Operations Research, 1988, 36(5):767-777.
[5]HERTZ A, LAPORTE G, MITTAZ M,et al. Heuristics for minimizing tool switches when scheduling part types on a flexible machine[J]. IIE Transactions, 1998,30(8):689-694.
[6]HOUSNI D, et al. A new heuristic based on a hypergraph representation for the tool switching problem[J]. International Journal of Production Economics, 2000,64(1-3): 165-176.
[7 ]AL-FAWZAN M A, et al. A tabu search based algorithm for minimizing the number of tool switches on a flexible machine[J].Computers & Industrial Engineering, 2003,44(1) : 35-47.
[8]SABUNCUOGLU I,et al. A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems[J]. IIE Transactions,1998,30(2): 179-191.
[9]ZHOU B H, ZHOU X J,CAI J G. A beam search based algorithm for flexible manufacturing
system scheduling[J]. Journal of Donghua University, 2002, 19(3):13-18.
|