[1]AI Baihui. Application analysis on project management during development of aeronautical products[J].Aviation Technology, 2001,(4):60-62(in Chinese).[艾百辉.项目管理在航空产品研制过程中的应用初析[J].航空科学技术,2001,(4):60-62.]
[2]LI QING, CHEN Yuliu, WANG Qing. Information mappling and integration between
process modeling and project management[J].Computer Integrated Manufacturing
Systems, 2001,7(7):25-30(in Chinese).[李 清,陈禹六,王青.过程建模与项目管理方法的信息映射与集成[J].计算机集成制造系统,2001,7(7):25-30.]
[3]CHEN Yuliu. IDEF Modeling analysis and design method[M].Beijing: Tsinghua Uniersity Press,2002.115-181(in Chinese).[陈禹六.IDEF建模分析和设计方法[M]. 北京:清 华大学出版社,2002.115-181.]
[4]CHEN Yuliu, LI QING, ZHANG Feng. Business process reengineering and system
integration[M].Beijing:Tsinghua University Press, Springer Press,2001(in Chinese).[陈禹六,李清,张锋.经营过程重
构(BRP)与系统集成[M].北京:清华大学出版社,施普林格出版社,2001.]
[5]XIONG Guangleng. Theory and practice of concurrent engineering[M].Beijing:Tsinghua University Press,2001(in Chinese).[熊光楞.并行工程的理论与实践[M].北京:清华大学出版社,2001.]
[6]BAI Sijun. Modern project management[M]. Beijing:China Machine Press, 2002.108-158(in Chinese).[白思俊.现代项目管理(中册)[M].北京:机械工业出版社,2002.108-158.]
|