[1]CHOI K H,KIM S C,YOOK S H. Multi-agent hybrid shop floor control system[J].Internal
Journal of Product Research,2000,(11):4193-4203.
[2]MEHRABI M E, ULSOY A G,KOREN Y. Reconfigurable manufacturing systems:key
to future manufacturing[J].Journal of Intelligent Manufacturing,2000,(11):403-419.
[3]WANG Chengen. Optimal reconfiguration of enterprise organizations and processes[J].Information
and Control,2001,30(7):581-585(in Chinese).[王成恩.企业组织与过程的优化重构[J].信息与控制, 2001,30(7):581-585.]
[4]HICK M. The executive guide to organizational transformation [EB/OL].http://www.eagle.ca/~mikehick,1997-12-07.
[5] TENG J,GROVER V,FIEDLER K. Developing strategic perspectives on business
process reengineering:from process reconfiguration to organizational change[J].Omega,International
Journal Mgmt Science,1996,24(3):271-294.
[6]GREEN P,ROSEMAN N. Integrated process modelling:an ontological evaluation[J].Information
Systems,2000,25(2):73-87.
[7]JANG Kijin. A model decomposition approach for a manufacturing enterprise
in business process reengineering[J].International Journal Computer Integrated
Manufacturing,2003,16(3):210-218.
[8]SHEN Yansen, JIANG Mei,DING Qiulin.Enterprise modeling for BPR and information
systems reconfiguration[J].Mini-Micro System,2002,23(4):505-508(in Chinese).[沈延森,姜梅,丁秋林.支持业务过程重组和信息系统重构的企业建模[J].小型微型计算机系统,2002,23(4):505-508.]
[9]HAMMER K, CHAMPY J. Reengineering the corporation:a manifesto for business
revolution[M]. New York,NJ,USA:Harper Collins, 1994.
[10]SHANG Wenli, WANG Chengen, ZHANG Shijie,et al. IDEF&UML based system modelling
method[J]. Computer Integrated Manufacturing Systems,2004,10(3):252-258(in Chinese)
[尚文利,王成恩,张士杰,等.基于IDEF&UML的系统建模方法[J].计算机集成制造系统,2004,10(3):252-258.]
[11]LI Qing,ZHAO Hong.Organizational modeling and analysis method[J].High Technology
Letters,2000,28(1):505-508(in Chinese).[李清,赵虹.组织建模及其分析方法研究[J] .高技术通讯,2000,28(1):505-508.]
|