[1]BOURJAULT A. Contributionaune approach methodology deL’assemblage automatise:elaboration
automatiquedes sequences operatioires[D].Universitede Franche,Comte,1984.
[2]Hemom de Mello,SANDERSON A C.Representation of mechanical assembly sequences[J].
IEEE Transactions on Robotics and Automation,1991,7(2):211-227.
[3]JIANG Hua,XIONG Guangleng,ZENG Qingliang.Methodology and technology of design
for assembly[J].Computer Integrated Manufacturing Systems,1999,5(4):56-60(in
Chinese).[姜华,熊光楞,曾庆良.面向装配的设计方法与技术研究[J].计算机集成制造系统,1999,5(4):56-60.]
[4]GUO Mugeng, CHEN Rongqiu.Analyzing and studying hierarchy assembly[J].Journal
of Jianghan Petroleum Institute,1998,20(2):110-114(in Chinese).[郭睦庚,陈荣秋.层次装配的分析与优化[J].江汉
石油学院学报,1998,20(2):110-114.]
[5]FU Yili,TIAN Lizhong,et al.Generation of assembly sequence based on fuzzy
theory[J].Journal of Harbin Institute of Technology,2002,34(6):739-742(in Chinese).[付宜利,田立中,等.基于模糊
评判的装配序列生成[J].哈尔滨工业大学报,2002,34(6):739-742.]
[6]BOOTH儀ROYD G.Product design for assembly and manufacture[M].Beijing:China
Machine Press,1999(in Chinese).[Boothroyd G.面向制造与装配的产品设计[M].北京:机械工业出版社,1999.]
[7]LI Hailong, DONG Jinxiang,et al.Assembly design based on constraints[J].Journal
CAD&CG,1997,19(3):249-255(in Chinese).[李海龙,董金祥,等.基于约束的装配体技术[J].计算机辅助设计与图形学学报,1997,19(3):249-255.]
[8]XU Zhenyu, QIU Xuanhuai,et al.Mechanical elements[M].Beijing: Higher Education
Press,1981(in Chinese).[许振宇,邱宣怀,等.机械零件[M].北京:高等教育出版社,1981.]
|