[1]CROWE C M,Reconciliation of process flow rates by matrix projection[J].AIChe Journal,1986,2(4):616-623.
[2]LIU Chuanzheng,YUAN Yi. Study on the data correct of chemical industry[J]. Chemical Engineering,1994,(6):69-72(in Chinese).[刘传政,袁一.关于化工数据校正问题的研究[J].化学工程,1994,(6):69-72.]
[3]YANG Youqi,TENG Rongbo.Interception and correct to error of process industry measurement[J].Chemical Industry and Engineering Society Newspaper,1996,47,(2):248-253(in Chinese).[杨友麒,滕荣波.过程工业测量数据中过失误差的侦破与校正[J].化工学报,1995,47,(2):248-253.]
[4]YUAN Yonggen,LI Huasheng.Process measurement data correct technology[M]. Beijing:Oil and Chemistry Industry Publishing Company,1996(in Chinese).[袁永根,李华生.过程测量数据校正技术[J].北京:石油化工出版社,1996.]
[5]East China normal university department of mathematics. Probability and mathematical statistics tutorial[M]. Beijing:Higher Education Press,1983(in Chinese).[华东师范大学数学系.概率论与数理统 计教程[J].北京:高等教育出版社,1983.]
[6]XIANG Jingtian, DU Jinguan,SHI Jiuen. Ynamic data manage-time series analyzed[M].Beijing:China Meteorological Press,1986(in Chinese).[项静恬,杜金观,史久恩.动态数据处理—时间序列分析[M]. 北京:气象出版社,1986.]
|