[1]AMICE. CIM-OSA:open system architecture for CIM[M].Garmany:Springer-Verlag,1993.
[2]WILLIAMS T J. Purdue enterprise reference architecture[M]. NC,USA:Instrument Society of American, 1992.
[3]SHEER A W,LI Qing,ZHANG Ping. ARIS-business process modeling[M]. Beijing:China
Machine Press, 2003(in Chinese).[奥古斯特·威廉·希尔,李清,张萍.集成的信息系统体系结构(ARIS)经营过程建模[M]
.北京:机械工业出版社,2003.]
[4]CHEN Yuliu.TSENG M M. A stair-like CIM system architecture[J]. IEEE Trans. on CPMT Part C, 1997,20(2):101-110.
[5]CHEN Yuliu. Stair-like CIM system architecture[J].Computer Integrated Manufacturing Systems,1999,5(3):30-38(in Chinese).[陈禹六.阶梯形CIM系统体系结构[J].计算机集成制造系统,1999,5(3):30-38.]
[6]CHEN Yuliu. Justification criteria for CIM implementation[J]. Computer Integrated Manufacturing Systems,1997,3(3):15-19(in Chinese).[陈禹六.实施CIMS的评价准则[J].计算机集成制造系统,1997,3(3):15-19.]
[7]VERNADAT F B. Enterprise modeling and integration (EMI):current status and research perspectives[J].Annual Reviews in Control,2002,26(1):15-25.
[8]CHEN Yuliu, TONG Yunhuan,et al.Correctly justify the results of implementing CIMS[A]. National Conference of CIMS[C]. Nanjing, 1998.100-108(in Chinese).[陈禹六,仝允桓,等. 正确评价实施CIM的成果[A]. 全国CIMS交流会[C].1998.100-108.]
[9]LIU Jieping. Research on enterprise system integration and technologies
of its evaluation and diagnosis [D].Beijing:Tsinghua University,2003(in Chinese).
[刘阶萍. 企业系统集成及其评价与诊断 技术研究[D].北京: 清华大学,2003.]
|