[1]ZOMAYA A Y. Special issue:part 1 scheduling:theory and applications[J]. International Journal of Foundations of Computer Science, 2001,12(5):559-564.
[2]BRIZUELA C A,NOBUO S. From the classical job shop to a real problem:a genetic algorithm approach[A].Proceedings of the 39th IEEE Conference on Decision and Control[C]. Sydney,Australia,2000.4174-4180.
[3]WANG L, ZHENG D Z. A modified genetic algorithm for job shop scheduling[J]. International Journal Manufacturing Technology,2002, (20):72-76.
[4]IMED K,SLIM H, PIERRE B. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems[J]. IEEE Transactions on Systems, and Cybernetics——Part C:Applications and Reviews,2002,32(1):1-13.
[5]WANG Haiying, WANG Fengru, LIU Qifeng. Solving nonstandard job-shop scheduling problem with due dates using bounding genetic algorithm[A]. Proceedings of the 3rd Word Congress on Intelligent Control and Automation[C].Hefei:Press of University of Science and Technology of China,2000.
[6]WANG Fengru, XU Weiwen, WANG Fenglin. Genetic algorithm based on sequence & value encoding and its application[J]. Electric Machines and Control,2001,5(1):64-68(in Chinese).[王凤儒,徐蔚文,王凤林.基于序值编码的遗传算法及应用[J].电机与控制学报,2001,5(1):64-68.]
[7]WANG Fengru, XU Weiwen, XU Hongfu. Solving nonstandard job-shop scheduling
problem by efficience scheduling algorithm[J]. Computer Integrated Manufacturing
Systems,2001,7(7):12-15( in Chinese).[王凤儒,徐蔚文,徐洪副.用效率调度算法求解非标准作业车间调度问题[J].计算机集成制造系统,2001,7(7):12-15.]
[8]KANG Ning,WANG Fengru, LIU Pi’e,et al.The reverse algorithm of job-shop scheduling problem with due dates[J]. Systems Engineering—Theory & Practice,1999,19(12):25-30(in Chinese).[康宁,王凤儒,刘丕娥,等.有交货期的单件车间调度问题的逆序算法[J].系统工程理论与实践,1999,19(12):25-30.]
|