[1]CHEN Wei,JIANG Weisun. The scheduling in batch flexible production system[J].
Control and Instruments in Chemical Industry, 1991,16(6):23-30(in Chinese).[陈伟
,蒋藯孙.化工柔性生产系统的生产调度[J].化工自动化及仪表,1991,16(6):23-30.]
[2]ZADEH L A. Fuzzy sets[J]. Information and Control, 1965,(8):338-353.
[3]FANG Shucheng,WANG Dingwei. Fuzzy optimization and fuzzy mathematics[M].
Beijing:Science Press,1997(in Chinese).[方述诚,汪定伟.模糊数学与模糊优化[M].北京:科学出版社,1997.]
[4]LIU Qi,GU Xingsheng. A kind of job shop schedule problems with uncertain
processing time[J]. Journal of East China University of Science and Technology,
2001, 27(5):442-445(in Chinese).[刘 琦,顾幸生.基于模糊规划的处理时间不确定条件下的Job shop问题[J].华东理工大学学报,2001,27(5):442-445.]
[5]BADELL M, NOUGUES J M, PUIGJANER L. Integrated on line production and financial
scheduling with intelligent autonomous agent based information system[J]. Computers
Chemical Engineering,1998,22(Supply):271-278.
[6]ZIMMERMANN H J. Application of fuzzy sets theory to mathematical programming[J].
Information Science, 1985,(36):29-58.
[7]Chun Jang Sung,Jang Hyun Kyo, Hahn Song Yop. A study on comparison of optimization
performances between immune algorithm and other heuristic algorithms[J]. IEEE
Transaction on Magnetics, 1998, 34(5):2972-2975.
[8]DASGUPTA D, Nii Attoh Okine. Immunity-based systems:a survey[A]. Proceedings
of the IEEE International Conference on Systems, Man and Cybernetics[C]. Orlando,
FL, USA:IEEE Press,1997.12-15.
[9]GU Xingsheng. A survey of production scheduling under uncertainty[J]. Journal
of East China University of Science and Technology, 2000, 26(5):441-446(in Chinese).[顾幸生.不确定性条件下的生产调度[J].华东理工大学学报,2000,26(5):441-446.]
|