[1]LOTTAZ C,SMITH I F C,ROBERT N Y, et al. Constraint-based support for negotiation in collaborative design[J]. Artificial Intelligence in Engineering,2000,14(3) :261-280.
[2]XU Wensheng, XIONG Guangleng, XIAO Tianyuan. Research on establishment of temporal constraint network and conflict detection in concurrent engineering[J]. Journal of System Simulation, 2003,15(2):185-189(in Chinese).[徐文胜,熊光楞,肖田元.并行工程中时间约束网络建立及冲突检测研究[J].系统仿真学报,2003,15(2):185-189.]
[3]ZHANG Shaotong, XIONG Guangleng, LI Tao,et al.Design and realization of distributed constraint management system[J]. Computer Engineering and Design,2001,22(4):25-28(in Chinese).[张少彤,熊光楞,李涛,等.分布式约束管理系统的设计与实现[J].计算机工程与设计,2001,22(4):25-28.]
[4]LI Tao, XIONG Guangleng.Conflict resolving strategy based on optimization
algorithm[J]. Chinese Journal Computers, 2002,25(1):57-62(in Chinese).[李涛,熊光楞.基于优化算法的冲突仲裁策略[J].计算机
学报,2002,25(1):57-62.]
[5]LI Xiang, YUAN Guohua, ZHOU Xionghui, et al. Research on collaborative design based on dynamic constraint satisfaction[J]. Mechanical Science and Technology, 2000,19(6):918-919(in Chinese) .[李祥,袁国华,周雄辉,等.基于动约束求解的协同设计研究[J].机械科学与技术, 2000,19(6):918-919.]
[6]DECHTER R, PEARL J. Network based heuristics for constraint satisfaction problem[J]. Artificial Intelligence,1988,(34):1-38.
|