[1]CHU Jian,SUN Youxian. Advance and thinking of integrated automation in process
industry[J].Manufacture Informalization,2002,31(supplement):24-28(in Chinese). [
褚健,孙优贤.流程工业综合自动化技术发展的思考[J].制造业信息化,2002,31(增刊):
24-28.]
[2]ZHENG Mingdeng.Status quo and level of chemical industry automation in
China[J].Control and Instruments in Chemical Industry, 1998,25(3):1-7(in Chinese). [
郑名登.我国化工自动化发展现状和水平[J].化工自动化及仪表,1998,25(3):1-7.]
[3]SYMONDS G H. Linear programming: the solution of refinery problems[M]. New
York, NY,USA:Esso Standard Oil Company, 1955.
[4]SIMON J D,AZAMA H M. Exxon experience with large scale linear and nonlinear
programming applications[J].Computers and Chemical Engineering, 1983,7(5):605-614.
[5]ADHYA N, TAWARMALANI H M,SAHINIDIS N V. A lagrangian approach to the pooling
problem[J].Industrial and Engineering Chemical Research, 1999,38(5):1956-1972.
[6]PORN R, HARJUNKOSKI I ,WESTERLUND T. Convexification of different classes of
non-convex MINLP problems[J].Computers and Chemical Engineering, 1999,23(3):
439-448.
[7]ZHANG J,ZHU X X, TOWLER G P. A simultaneous optimization strategy for overall
integration in refinery planning[J].Industrial and Engineering Chemical Research, 2001
,40(12):2640-2653.
[8]Bonner & Moore. RPMS (Refinery and Petrochemical Modeling System):a system
descriptive[M]. Houston, TX,USA: Bonner & Moore Management Science,1979.
[9]PIMS system reference, version 11.0[M]. Cambridge, MA,USA:Aspen Technology
Inc.,1999.
[10]PELHAM R,PHARRIS C. Refinery operation and control: a future
vision[J].Hydrocarbon Processing, 1996,75(7):89-94.
|