[1]LEE Y, KIM S, YEA S, et al. Production planning in a semiconductor wafer fab
considering variable cycle times [J]. Computers in Industrial Engineering, 1997,
33(3):713-716.
[2]SHENAI V D. A mathematical programming based procedure for the scheduling of lots
in a wafer fab[D]. Blacksburg, Virginia,USA: Industrial and Systems Engineering, 2001.
[3]OMAR M. Scheduling the hybrid flow shop-branch and bound[D].
Belgium:Institutd Administration et de Gestion (IAG), 1999.
[4]DREXL A,KIMMS A.Lot sizing and scheduling-survey and extensions(Invited review)
[J]. European Journal of Operation Research,1997,99(2):221-235.
[5]Management Accounting Committee.Theory of constraints(TOC) management system
fundamentals[M].Montvale, NJ,USA:the Institute of Management Accountants(IMA),1999.
[6]CHEN Qishen. Theory of constraints[J]. Computer Integrated Manufacture
Systems,1998,4(5):51-55(in Chinese).[陈启申.约束理论[J].计算机集成制造系统,1998,4(5)
:51-55.]
[7]Operational Research Committee. Operational research[M]. Beijing:Tsinghua
University Press,1990.441-461(in Chinese).[运筹学教材编写组.运筹学[M].北京:清华大学
出版社,1990.444-461.]
[8]GOLDRATT E M,COX J. The goal:a process of ongoing
improvement[M].Crotonon-Hudson North River Press,1992.
|