[1] WANG Qing, SHI Weixiang. Mining technology [M]. Beijing: Metallurgy Industry Press, 2001(in Chinese).[王 青,史维祥.采矿学[M].北京:冶金工业出版社, 2001.] [2] CACCETTA L, HILL S P. An application of branch and cut to open pit mine scheduling[J].Journal of Global Optimization, 2003,27:349-365.
[3] CACCETTA L, HILL S P. Branch and cut methods for network optimization[J]. Mathematical and Computer Modeling, 2001,33:517-532.
[4] GERSHON M.Heuristic approaches for mine planning and production scheduling[J].Int. Journal of Mining and Geological Engineering,1987,5:1-13.
[5] DAGDELEN K. Optimum multi period open pit mine production scheduling[D]. Golden: Colorado School of Mines,1985.
[6] DAGDELEN K, JOHNSON T B. Optimum open pit mine production scheduling by Lagrangian parameterization[A]. Proceeding of 19th APCOM Symposium[C].University Park,PA:SME-AIME,1986.127-139.
[7] ZHANG Y Q, YUN Q X, GUI E Y, XU L J. A new approach for production scheduling in open-pit mines[A]. Proceeding of the 19th APCOM Symposium[C].University Park,PA:SME-AIME,1986.71-78.
[8] FYTAS K. A computerized model of open pit short and long range production scheduling[A]. In: Proceeding of 19th APCOM Symposium[C].University Park,PA:SME-AIME,1986.109-119.
[9] STEUER R E. Multiple criteria optimization:theory, computation, and application[M]. Hoboken:John Wiley&Sons, Inc.,1986.
[10] WHITE D J. A bibliography on the applications of mathematical programming multiple-objective methods [J]. Journal of the Operational Research Society, 1990, 41(8): 669-691.
|