[1] CONRY S E, KAZUHIRO K, LESSER V R, et al. Multistage negotiation for distributed constraint satisfaction[J]. IEEE Transactions on System, Man, and Cybernetics, 1991,21(6): 1462-1477. [2] BRUCKER P, DREXL A, MHRING R,et al. Resource-constrained project scheduling: notation, classification, model, and methods[J]. European Journal of Operational Research, 1999,112(1): 3-41.
[3] FLESZAR K, HINDI K S. Solving the resource-constrained project scheduling problem by a variable neighborhood search [J]. European Journal of Operational Research, 2004,155(2):402-413.
[4] SU Zhilong, CHEN Qingxin, CHEN Xin, et al . Rough Project-Planning for Mould and Die Virtual Enterprise in CPC [J]. Chinese Journal of Mechanical Engineering, 2003,39(1):38-45(in Chinese). [苏志龙,陈庆新,陈 新,等. CPC环境下的模具虚拟企业项目粗规划[J]. 机械工程学报,2003,39(1):38-45.]
[5] SU Zhilong , CHEN Qingxin, CHEN Xin, et al . Project planning for mould and die virtual enterprise based on negotiation [J]. China Mechanical Engineering,2002,13(22):1931-1936(in Chinese). [苏志龙,陈庆新,陈新,等. 基于协商的模具虚拟企业生产项目规划[J]. 中国机械工程,2002,13(22):1931-1936.]
[6] LEU Sousen, CHEN Anting, YANG Chunghuei. A GA-based fuzzy optimal model for construction time-cost trade-off[J]. International Journal of Project Management, 2001,19(1):47-58.
[7] SHAFTEL T L, WILSON B M. Time-cost evaluation of alternative system/process designs[J]. International Transactions in Operational Research, 1999,6(3):275-288.
[8] LI Jianqiang, FAN Yushun . Project management in virtual enterprise[J]. Computer Integrated Manufacturing Systems, 2002,8(3):187-192(in Chinese). [李建强,范玉顺. 虚拟企业环境中的项目调度方法[J].计算机集成制造系统,2002,8(3):187-192.]
|