[1] STONEBRAKER P W. Restructuring the bill of material for productivity: a strategic evaluation of product configuration [J]. International of Production Economics, 1996,45(1-3):251-260. [2] BREULS I. Integrating PDM with ERP [EB/OL]. http://www.baan.com/Integrating PDM with ERP By Pierre Breuls.htm, 2004-07-19.
[3] CHEN Qishen. ERP—step forward from internal integration[M].Beijing:Publishing House of Electronics Industry,2004(in Chinese).[陈启申. ERP——从内部集成起步[M]. 北京:电子工业出版社,2004.]
[4] LU Huaijing, YU Dingwen, ZHANG Yufeng. Construction of assembly BOM for integration of PDM and MRPⅡ[J]. Machine Design and Manufacturing Engineering, 2002,31(1):34-36(in Chinese).[卢怀静,郁鼎文,张玉峰. 面向PDM/MRPⅡ集成的装配BOM[J]. 机械设计与制造工程,2002,31(1):34-36.]
[5] LIU Xiaobing, HUANG Xuewen, MA Yue, et al. Research on xBOM for product whole life cycle [J]. Computer Integrated Manufacturing Systems, 2002,8(12): 983-987(in Chinese).[刘晓冰,黄学文,马 跃,等.面向产品全生命周期的xBOM研究[J].计算机集成制造系统,2002,8(12):983-987.]
[6]ZHAN Dechen,WANG Zhongjie, LI Xiaoping, et al. The method of drawing network graph based on BOM/BOP[J].China Mechanical Engineering, 2003,14(1): 120-125(in Chinese).[战德臣,王忠杰,李小平,等.基于物料清单/工艺清单的网络图绘制方法[J].中国机械工程,2003,14(1):120-125.]
[7] GENG Suyun, QU Wanling, ZHANG Li’ang. Discrete mathematics [M].Beijing: Tsinghua University Press,1992(in Chinese).[耿素云,屈婉玲,张立昂. 离散数学[M]. 北京:清华大学出版社,1992.]
[8] ZHU Haiping, SHAO Xinyu, CAI Ligang, et al. Research on BOM-oriented CAPP system [J]. Joumal of Huazhong University of Science & Technology,2001,29(4):57-59(in Chinese).[朱海平,邵新宇,蔡力钢,等. 面向BOM的CAPP系统研究与实践[J].华中科技大学学报,2001,29(4):57-59.]
|