[1] LIU Fei, YANG Dan, WANG Shilong. CIMS manufacturing automation[M]. Beijing: China Machine Press, 2003(in Chinese).[刘 飞,杨 丹,王时龙.CIMS制造自动化[M].北京:机械工业出版社,2003.] [2] HOLTTHAUS O, ZIEGLER H. Improving job shop performance by coordinating dispatching rules[J]. International Journal of Production Research, 2004,35:539-549.
[3] PANG Hali. Flexibility job shop integration programming model and its solution approach[J]. Control and Decision-making ,2003,18(1):34-39(in Chinese).[庞哈利.柔性job shop集成化计划调度模型及其求解算法[J].控制与决策,2003,18(1):34-39.]
[4] GUPTA S, SEN T. Minimizing the range of lateness on a single machine[J].Journal of The Operational Research Socicty,2004,35:853-857.
\[5\] BAKER K R. Sequencing with earliness and tardiness penalties(A review)[J]. Operation Research, 2005,38(1):22-36. [6] LIAO C J, HUANG R H. An algorithm for minimizing the range of latenesson a single machine[J].Journal of The Operational Research Socicty,2004,42( ):183-186.
[7] LI Jingyuan. Operational practice for spot management of Production dispatcher in the Modern enterprise[M].Beijing:China Economic Publishing House,2004(in Chinese).[李景元. 现代企业生产调度员现场管理运作实务[M].北京:中国经济出版社,2004.]
[8] LIU Hongjie,WANG Xiufeng. Self adaptive genetic algorithm of multi-search[J]. Controlling Theory and Application, 2004, 21(2):302-304 (in Chinese).[刘洪杰,王秀峰.多峰搜索的自适应遗传算法[J].控制理论与应用,2004,21(2):302-304.]
[9] XIONG Rui.On the current technology and development of job-shop scheduling[J]. Journal of Tsinghua University,1998,38(10):55-60(in Chinese).[熊 锐.车间生产调度问题的技术现状与发展趋势[J].清华大学学报, 1998,38(10):55-60.]
|