[1]LIAO Ren,CHEN Qingxin,MAO Ning.A heuristic algorithm for resource constrained project scheduling[J].Journal of Industrial Engineering and Engineering Management,2002,16(S1):100-103(in Chinese).[廖仁,陈庆新,毛宁.资源约束下多项目调度的启发式算法[J].管理工程学报,2002,16(S1):100-103.]
[2]HARTMANN S,BRISKORN D.A survey of variants and extensions of the resource-constrained project scheduling problem[J].European Journal of Operational Research,2010,207(1):1-14.