[1]LAI Zhixiang. Research and implementation on the system of sub-yard hull dynamic scheduling and production process optimization [D]. Guangzhou: South China University of Technology,2010(in Chinese). [赖志向.船体分段堆场动态调度及生产流程优化系统的研究与实现[D].广州:华南理工大学,2010]
[2] PARK C, CHUNG K H, PARK J C, et al. A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project [J]. Production Planning & Control, 2002, 13(4):342-354