[1]ZHANG Jie, LI Yuan, YU Jianfeng, et al. Fast work breakdown structure generation algorithm for aircraft assembly scheduling based on assembly order[J].Computer Integrated Manufacturing Systems,2009,15(2):333-338(in Chinese).[张杰,李原,余剑峰,等.基于装配指令的飞机装配作业工作结构分解快速生成算法[J].计算机集成制造系统,2009,15(2):333-338.]
[2]THIAGARAJAN S, RAJENNDRAN C. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs[J].Computer & Industrial Engineering,2005,49(4):463-503.