WANG Jun-qiang1,2,KANG Yong1,2, CHEN Jian1,2, GUO Yin-zhou1,2, ZHANG Ying-feng1,2, SUN Shu-dong1,2. Identification approach for bottleneck cluster in a Job Shop[J]. .
[1]WANG Junqiang, SUN Shudong, WANG Dongcheng, et al. Management & control of manufacturing cells based on theory of constraints[J]. Computer Integrated Manufacturing Systems,2006,12(7):1108-1116(in Chinese). [王军强, 孙树栋, 王东成,等.基于约束理论的制造单元管理与控制研究[J]. 计算机集成制造系统, 2006,12(7):1108-1116.]
[2]LIU Yong, GU Hanyu, XI Yugeng. Planning and scheduling algorithm based on TOC for complex hybrid flow shop problems[J]. Computer Integrated Manufacturing Systems,2005,11(1):97-103(in Chinese).[刘勇,谷寒雨,席裕庚.基于约束理论的混合复杂流水线规划调度算法[J].计算机集成制造系统,2005,11(1):97-103.]